10/9/6
10/10/6
10/11/6
10/12/6
10/13/6
10/14/6
  1st. Meeting
1. Recap.
2. Prez- Andrew
VP - Kevin
3. We wish to work
on PS/2 controller &
'03 bot before Jan.
4. Training.
  Meeting
1. Started flyer.
2. Started
organizing.
3. Voted on working
on '03 bot.
4. Will work on PS/2
controller.
Team
registered
for NYC
Regional.
 
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
10/16/6
10/17/6
10/18/6
10/19/6
10/20/6
10/21/6
  Meeting
1. Worked on flyer
2. Made fundraising list.
3. Recruited 5 new
members.
4. Drawing training.
  Meeting
1. Organize bolt case.
2. Made bolt list.
3. PS/2 joystick
mapping
4. Fundraising.
5. Training
  Meeting
1. Sorted bolt case.
2. PS/2 joystick
map work.
3. Drew '03 bot.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
10/23/6
10/24/6
10/25/6
10/26/6
10/27/6
10/28/6
  Meeting
1. Training - drawing.
2. 2003 robot design.
3. PS/2 controller
rewire.
4. Halloween '06 bot.
  Meeting
1. Training - drivetrain.
2. Funding review.
3. Organize tools.
4. Controller  rewire.
5. Halloween '06 robot.
  Meeting
Worked on wings.
GOALS-
2wks/bot
1. organize
2. PS/2 control
3. Fix 03 bot
4. recruiting
5. fundraising

TRAINING
1. drafting
2. mechanics
3. programming
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
10/30/6
10/31/6
11/1/6
11/2/6
11/3/6
11/4/6

Halloween
Meeting Cancelled

HALLOWEEN
  Meeting
1. Framed out the
dragon bot.
2. Added chicken
wire to the dragon
bot.
  Meeting
1. Organize
2. Painted head of
dragon bot red.
3. Cut out card-
board teeth/spikes.
4. '03 bot rebuild.
5. Controller work.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
11/6/6
11/7/6
11/8/6
11/9/6
11/10/6
11/11/6
  Meeting
1. Drivetrain lesson.
2. Funding letters.
3. '03 bot rebuild.
      Meeting
1. Cut '03 bot main
board - great job
Killian & Modesto.
2. Fraction Mea-
surement class.
3. Controller work.
4. Lights wired.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
11/13/6
11/14/6
11/15/6
11/16/6
11/17/6
11/18/6
  Meeting
1. Painted dragon bot.
2. Bolted plywood
board to '03 bot.
3. Continued drawing
'03 bot. drivetrain.
  Meeting
1. Painted dragon bot.
2. Attached teeth and
spikes.
3. Worked on Safety
animation.
4. Organized
basement.
  Meeting
1.  Programming
class held in C.
2. Attached front
caster wheels.
3. Drew motor
layout.
4. Drew elec. dwg.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
11/20/6
11/21/6
11/22/6
11/23/6
11/24/6
11/25/6
  Meeting
1. Continued elec.
drawing.
2. Finish motor
drawing.
3. Dragon bot touchup.
4. Made battery holder
  Thanksgiving
Holiday
Holiday
Holiday
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
11/27/6
11/28/6
11/29/6
11/30/6
12/1/6
12/2/6
  Meeting
1. Finished elec.
design.- Mathew
2. Completed one
motor assembly.
3. Attached large red
light to bot.
  Meeting
1.Installed a few
electrical components
2. Attached one motor
assembly. -Kevin
3. Completed second
motor assembly
  Meeting
1. Programmed in
C - class 2.
2. Attached second
motor assembly.
3. Drivetrain done!
4. Installed  
electrical pieces.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
12/4/6
12/5/6
12/6/6
12/7/6
12/8/6
12/9/6
      Meeting
1. Wire elec. board.
2. Attached storage
tanks to 2nd. level.
3. Started arm work.
4 Finished dragon
bot!
PAYMENTS
DUE TO
FIRST!
Meeting
Program. Class3.
-moved the mini-
robot
autonomously!
-Arm work.
-Pneumatics work.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
12/11/6
12/12/6
12/13/6
12/14/6
12/15/6
12/16/6
  Meeting
1. Pneumatics work
done.
2. Arm work done.
3. Electrical work done.
  Meeting
1. Pneumatics work
done.
2. Arm work done.
3. Electri. work done.
4. Practiced driving.
  Meeting
1. Elect. work done.
2. Arm work done.
3. Chain work done.
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
12/25/6
12/26/6
12/27/6
12/28/6
12/29/6
12/30/6
CHRIST-
MAS!
WINTER
RECESS
WINTER
RECESS
WINTER
RECESS
WINTER
RECESS
WINTER
RECESS
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
1/1/7
1/2/7
1/3/7
1/4/7
1/5/7
1/6/7
WINTER
RECESS
Meeting
1. Welcome back.
2. Arm rebuilt 80%.
3. Tightened left chain.
4. Tested 2003 bot
drivetrain-  works good
now.
  Meeting (2003 robot )
1. Arm completed.
2. Installed arm.
3. Team  spoke @SLP
4. Installed 2nd. level.
5. Wired comp.&light.
6. Prepped for kick-off.
  KICK-OFF
@ Polytechnic
University
meet at UNHS
@ 8:00am sharp
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT
12/18/6
12/19/6
12/20/6
12/21/6
12/22/6
12/23/6
  Meeting
1. Pneumatics work
2 .Elect. work done.
3. Bumper work done.
4. Practiced driving.
  Meeting
1. Attached bumpers.
2. Tightened chains.
3. Installed wi-fi card.
4. Practiced driving.

Merry Christmas!